Risks Related to Dependence on Third Parties

 

We and our contract manufacturers are subject to significant regulation with respect to manufacturing our product candidates. The manufacturing facilities on which we rely may not continue to meet regulatory requirements and have limited capacity.

 

We currently have a relationship with only one supplier, Lonza, for the manufacturing of the API for vonapanitase for clinical testing purposes, and intend to continue to use Lonza as our sole or primary supplier of the API for vonapanitase in the future. We have used two companies, Jubilant HollisterStier and Patheon Manufacturing Services Inc. (formerly DSM Pharmaceuticals), to vial and make our vonapanitase finished product. We also expect to rely upon third parties to produce materials required for the commercial production of vonapanitase or any additional product candidates if we succeed in obtaining the necessary regulatory approvals. This may increase the risk that we will not have sufficient quantities of our product candidates to conduct our clinical trials or such quantities at an acceptable cost, which could result in the delay, prevention, or impairment of clinical development and commercialization of our product candidates.

 

All entities involved in the preparation of drugs or biologics for clinical trials or commercial sale, including our existing contract manufacturers, are subject to extensive regulation. Ingredients of a finished therapeutic biologic product approved for commercial sale or used in clinical trials must be manufactured in accordance with cGMPs and equivalent foreign standards. These regulations govern manufacturing processes and procedures (including record-keeping) and the implementation and operation of quality systems to control and assure the quality of investigational products and products approved for sale. Poor control of production processes can lead to the introduction of adventitious agents or other contaminants, or to inadvertent changes in the properties or stability of product candidate that may not be detectable in final product testing. We or our contract manufacturers must supply all necessary documentation in support of a BLA on a timely basis and must adhere to the FDA’s cGMPs regulations enforced by the FDA through its facilities inspection program. Any failure by our third-party manufacturers to comply with cGMPs, or failure to scale-up and validate manufacturing processes, including any failure to deliver sufficient quantities of product candidates in a timely manner for the process validation required in connection with a BLA submission, could lead to a delay in, or failure to obtain, regulatory approval of vonapanitase or any additional product candidates. For example, on November 27, 2013, our third-party supplier of finished biological product, Jubilant HollisterStier, received a Warning Letter from the FDA alleging that the company was not complying with cGMPs. We received a letter from the FDA on February 13, 2014, stating that the Warning Letter does not impact the batch of finished product we are using for our Phase 3 clinical trials. However, if Jubilant HollisterStier or any other third-party supplier does not have an acceptable cGMP compliance status at the time of review by the FDA of any BLA we might submit, approval of the BLA would be delayed. This third party supplier or other third parties could encounter similar difficulties that could impede our clinical trials, approval or commercialization.

 

Our facilities and quality systems and the facilities and quality systems of some or all of our third-party contractors must also pass a pre-approval inspection for compliance with the applicable regulations as a condition of regulatory approval of vonapanitase or any additional product candidates. In addition, the regulatory authorities may, at any time, audit or inspect a manufacturing facility involved with the preparation of our product candidate or the associated quality systems for compliance with the regulations applicable to the activities being conducted. If these facilities and quality systems do not pass a pre-approval plant inspection from the FDA or a comparable foreign authority, approval of our product candidate by the FDA or the equivalent approvals in other jurisdictions will not be granted until the regulatory authority is satisfied that the facility complies with applicable regulations.

 

Regulatory authorities also may, at any time following approval of a product for sale, audit our manufacturing facilities or those of our third-party contractors. If any such inspection or audit identifies a failure to comply with applicable regulations or if a violation of our product specifications or applicable regulations occurs independent of such an inspection or audit, we or the relevant regulatory authority may require remedial measures that may be costly and/or time-consuming for us or a third party to implement and that may include the temporary or permanent suspension of a clinical trial or commercial sales or the temporary or permanent closure of a facility. Any such remedial measures imposed upon us or third parties with whom we contract could materially harm our business.

 