Proteon logo     Print Page | Close Window

SEC Filings

S-1
PROTEON THERAPEUTICS INC filed this Form S-1 on 09/16/2014
Entire Document
 

Table of Contents

        Third party payors, whether foreign or domestic, or governmental or commercial, are developing increasingly sophisticated methods of controlling healthcare costs. In addition, in the United States, no uniform policy of coverage and reimbursement for drug products exists among third-party payors. Therefore, coverage and reimbursement for drug products can differ significantly from payor to payor. Further, we believe that future coverage and reimbursement will likely be subject to increased restrictions both in the United States and in international markets. Third party coverage and reimbursement for our products or product candidates for which we receive regulatory approval may not be available or adequate in either the United States or international markets, which could have a negative effect on our business, results of operations, financial condition and prospects.


Risks Related to Dependence on Third Parties

We and our contract manufacturers are subject to significant regulation with respect to manufacturing our product candidates. The manufacturing facilities on which we rely may not continue to meet regulatory requirements and have limited capacity.

        We currently have a relationship with only one supplier, Lonza AG, for the manufacturing of active pharmaceutical ingredient, or API, for PRT-201 for clinical testing purposes, and intend to continue to utilize Lonza as our sole or primary supplier in the future. We have used two companies, Jubilant HollisterStier and DSM Pharmaceuticals, to vial and make our PRT-201 finished product. We also expect to rely upon third parties to produce materials required for the commercial production of PRT-201 or any additional product candidates if we succeed in obtaining the necessary regulatory approvals.

        All entities involved in the preparation of drugs or biologics for clinical trials or commercial sale, including our existing contract manufacturers, are subject to extensive regulation. Ingredients of a finished therapeutic biologic product approved for commercial sale or used in late-stage clinical trials must be manufactured in accordance with cGMP and equivalent foreign standards. These regulations govern manufacturing processes and procedures (including record keeping) and the implementation and operation of quality systems to control and assure the quality of investigational products and products approved for sale. Poor control of production processes can lead to the introduction of adventitious agents or other contaminants, or to inadvertent changes in the properties or stability of product candidate that may not be detectable in final product testing. We or our contract manufacturers must supply all necessary documentation in support of a BLA on a timely basis and must adhere to the FDA's good laboratory practices, or GLPs, and cGMP regulations enforced by the FDA through its facilities inspection program. Any failure by our third-party manufacturers to comply with cGMP or failure to scale-up manufacturing processes, including any failure to deliver sufficient quantities of product candidates in a timely manner for the process validation required in connection with a BLA filing, could lead to a delay in, or failure to obtain, regulatory approval of PRT-201 or any additional product candidates. For example, on November 27, 2013, our third-party supplier of finished biological product, Jubilant HollisterStier, received a Warning Letter from the FDA alleging that the company was not complying with cGMPs. We received a letter from the FDA on February 13, 2014, stating that the Warning Letter does not impact the batch of finished product we intend to use for our Phase 3 clinical trials. However, this third party or other third parties could encounter similar difficulties that could impede our clinical trials or commercialization. Our facilities and quality systems and the facilities and quality systems of some or all of our third-party contractors must also pass a pre-approval inspection for compliance with the applicable regulations as a condition of regulatory approval of PRT-201 or any additional product candidates. In addition, the regulatory authorities may, at any time, audit or inspect a manufacturing facility involved with the preparation of our product candidate or the associated quality systems for compliance with the regulations applicable to the activities being conducted. If these facilities and quality systems do not pass a pre-approval plant inspection from the FDA or a comparable foreign authority, approval of our product candidate by the FDA or the equivalent approvals in other jurisdictions will not be granted until the regulatory authority is satisfied that the facility complies with applicable regulations.

28